Submission Number: 26637
Submission ID: 96696
Submission UUID: baf88f1c-a98a-4b9f-905b-9f72e4111ba8

Created: Mon, 07/01/2024 - 19:39
Completed: Mon, 07/01/2024 - 19:39
Changed: Mon, 07/08/2024 - 16:19

Remote IP address: (unknown)
Submitted by: erin.fogerty-miller
Language: English

Is draft: No

Locked: Yes
Pollution Control Agency
Bay West Inc
235442
General Mills, Minneapolis
AI 102356/PRO20230001
The scope of work includes: conducting two rounds of paired sub-slab, indoor, and outdoor air sampling at the five site buildings on the 2010 E. Hennepin property; preparing bid specifications for the installation of a sub-slab depressurization (SSD) system at one residential property; completing vapor intrusion mitigation oversight and post mitigation confirmation sampling at one residential property; and reporting of sampling results, including results received in late FY23.
Project Duration
Tue, 09/05/2023 - 00:00
Sun, 06/30/2024 - 00:00
Sun, 06/30/2024 - 00:00
Yes
{Empty}
Contract Amounts
$73991.48
{Empty}
$73991.48
Yes
State
No
{Empty}
Tom Reppe
thomas.reppe@state.mn.us
Very satisfied
Satisfied
Very satisfied
Very satisfied - The Contractor provided excellent technical and project management communications to MPCA staff regarding status of the project, sampling events, lab results, etc.
Yes
{Empty}
5 - very satisfied