Pollution Control Agency
WSP USA Environment & Infrastructure, Inc.
234058
Minnetonka Blvd & Raleigh Ave Site, 5101 Minnetonka Blvd
AI 195377/PRO20230001
The scope of work includes conducting additional vapor intrusion and groundwater investigation to further evaluate impacts at the Site and surrounding properties. The scope includes: conducting soil vapor intrusion sampling and communications with property owners; groundwater monitoring/sampling; preparation of bid documents for a State Contractor to install a sub-slab depressurization system at up to one residential property; oversight of the mitigation activities and confirmation sampling; providing assistance to the MPCA with preparation of reports for submittal to EPA; and reporting of sampling results to the MPCA and property owners.
Project Duration
Tue, 08/15/2023 - 00:00
Sun, 06/30/2024 - 00:00
Sun, 06/30/2024 - 00:00
Yes
{Empty}
Contract Amounts
$134744.64
$-95829.08
$38915.56
Yes
State
No
{Empty}
Tom Reppe
thomas.reppe@state.mn.us
Very satisfied
Very satisfied
Satisfied
Very satisfied - The Contractor provided excellent communications to MPCA staff regarding sampling events, schedule, and results. Although the activities were limited by MPCA not receiving access to properties, the Contractor did an excellent job working with MPCA staff to amend the original contract so that the unused funds could be used to conduct other activities at the Site.
Yes
{Empty}
5 - very satisfied