Submission Number: 26981
Submission ID: 99571
Submission UUID: d8eac292-51c4-44a0-8093-caf39ab40550

Created: Tue, 08/13/2024 - 15:25
Completed: Tue, 08/13/2024 - 15:25
Changed: Tue, 08/13/2024 - 19:22

Remote IP address: (unknown)
Submitted by: dalia.jorge
Language: English

Is draft: No

Locked: Yes
Transportation Department
Toltz, King, Duvall, Anderson and Associates, Inc
246120
Box Girder Internal Inspections
1056229
Metro District does not have the staffing capabilities to perform internal inspections of box girder bridges in addition to the
770+ routine inspections that MnDOT has a statutory obligation to complete each year. This contract served to complete
additional inspection needs to determine the overall structural condition of bridges with components that are not easily
inspected.
Project Duration
Tue, 04/02/2024 - 00:00
Sun, 06/30/2024 - 00:00
Sat, 06/29/2024 - 00:00
Yes
{Empty}
Contract Amounts
$99998.14
{Empty}
$99998.14
Yes
state funds
Yes
In order to comply with MnDOT and Federal regulations, all bridge inspections must be performed by MnDOT-certified Team
Leaders. There is currently a limited number of consultants within the Metro region that have Team Leaders on staff that had
the ability to complete the project within the time constraints.
Arseneau,Michael Bernard
Michael.Arseneau@state.mn.us
All field work and documentation was completed and submitted within the required time frame.
The report and deliverable quality met the standards required by Metro Bridge.
Metro Bridge staff has no complaints with the amount of work completed within the contract budget
good
Yes
{Empty}
5 - very satisfied